Vacuum pressure sintering furnace

Vacuum pressure sintering furnace
In vacuum pressure sintering furnace this equipment, sintering material under high temperature is also subject to mechanical stress and the effect of vacuum, can be used in the sintering density after casting products. General powder material filling in the graphite mold, mechanical pressure by 700-1500 mn/m3, and heated to 2500 ℃ in the vacuum. Mold by direct current heating, indirect heating.
Vacuum pressure sintering furnace is mainly used for sintering is the density of the material with high temperature gas reactions billet, such as oxide, carbide and boride gas after sintering material can reach very high density, general density is greater than the theoretical value of 95%, and with high purity. Graphite resistor and graphite mould in the vacuum operation of weight loss is minimal. Vacuum hot pressing sintering is at the same time in the compaction process and utilization of high pressure, temperature and time, and many other parameters to control the quality of the sintered body.

2016年12月4日星期日

The classification of vacuum sintering furnace and the specific use for details

The classification of vacuum sintering furnace and the specific use for details
Vacuum sintering furnace is mainly used for metal powder products, metal injection forming products, hard alloy, ceramic, sintered ndfeb, stainless steel, non-woven fabrics, etc. High temperature of vacuum sintering furnace and vacuum heat treatment furnace structure is basically the same, just according to the sintering process make the appropriate changes.
Vacuum sintering furnace is divided into double vacuum sintering furnace and single loop outdoor pressurized air cooled vacuum sintering furnace Double the same sintering furnace, vacuum sintering furnace has two public a set of vacuum system and electric control system; In operation, two furnace for heating and cooling, mutual used interchangeably. No.1 has one time in the same furnace, degreasing, the function of the sintering and sintering. Degreasing system including external pipeline, vacuum valve, condenser, collector and mechanical pump device. Single cycle outdoor pressurized air cooled sintering furnace need high vacuum pumping speed of vacuum unit, to meet the requirements of ndfeb sintering process. This furnace structure and single loop outdoor pressure gas quenching vacuum furnace are the same.

2016年11月28日星期一

Vacuum pressure sintering furnace

Vacuum pressure sintering furnace
In vacuum pressure sintering furnace this equipment, sintering material under high temperature is also subject to mechanical stress and the effect of vacuum, can be used in the sintering density after casting products. General powder material filling in the graphite mold, mechanical pressure by 700-1500 mn/m3, and heated to 2500 ℃ in the vacuum. Mold by direct current heating, indirect heating.
Vacuum pressure sintering furnace is mainly used for sintering is the density of the material with high temperature gas reactions billet, such as oxide, carbide and boride gas after sintering material can reach very high density, general density is greater than the theoretical value of 95%, and with high purity. Graphite resistor and graphite mould in the vacuum operation of weight loss is minimal. Vacuum hot pressing sintering is at the same time in the compaction process and utilization of high pressure, temperature and time, and many other parameters to control the quality of the sintered body.

2016年11月13日星期日

Vacuum sintering furnace operation need to be aware of the safety of the "six"

Vacuum sintering furnace operation need to be aware of the safety of the "six"
A lot of people in the use of vacuum sintering furnace is will encounter a few problems, it may be because the operator does not pay attention to these problems, the following is to tell everyone about a vacuum sintering furnace safety operation need to be aware of "6"
1, check the vacuum pump power supply system, the pulley belt tightness, vacuum pump oil is located in the oil seal observation hole centerline. Check completed after artificial turn the vacuum pump pulley, without exception, but in the case of closing butterfly valve, vacuum pump.
2, check the vacuum furnace, vacuum furnace in the level of health, good insulation, induction coil, vacuum sealing tape elastic, qualified size.
3, check the lever handle to start the vacuum furnace is flexible.
4, check the rotation type McLeod gauge whether accord with requirement.
5, check the graphite crucible furnace charging accessories are complete.
6, vacuum furnace cover of observation, the thermometer hole, each furnace must be clean processing, in order to observe and temperature measurement.
Above is about the safety of vacuum sintering furnace operation, as long as to master the correct steps and pay attention to some detail problems can make us vacuum sintering furnace and effective operation.

2016年10月31日星期一

What is the importance of vacuum sintering furnace cooling system?

What is the importance of vacuum sintering furnace cooling system?

Vacuum sintering furnace is electric heating element near the vacuum heating furnace. Vacuum furnace cooling system is an important part of vacuum furnace. Cooling water should maintain smooth, otherwise the temperature rise caused downtime. This is vacuum furnace work often neglected problems When no one management major damage may result in vacuum furnace.
Molybdenum vacuum furnace heating after long time use will harden, shrinkage, drop, lodging first lap, after fusing (melting) wait for a phenomenon. To make the vacuum furnace heating wire is necessary strength at high temperature, prevent hardening, collapsed or droop, first to design the structure of the vacuum furnace heating wire size, such as spiral wire, pay attention to the heating element bending diameter, pitch and screw pitch diameter, etc. The heating body is going to loose by vacuum furnace insulation lining, 95 ceramic on insulation lining is put aside, leave the expansion space. Shelve location should be suitable for, one is in commonly 100 ~ 100 mm, and can prevent resistance wire to lie prone on strong hook. Also should avoid furnace silk direct contact between each other (short circuit), usually to pad spacer.
Deal with cooling water with biological decomposition chemical auxiliary method, the purpose is to keep the minerals in suspended state, reduce the rubber tube, coil and water jacket in sediment accumulation, to make the water clear. This generally adopts an automatic device to complete, it can monitor the conductivity of the water, automatically added chemicals, wash water, add fresh water. Cooperate with auxiliary steam filtration system, this method can guarantee the pH of the water control, to prevent redundant mineral deposits in the cooling water system. After the system work stable, at least once a month for the water quality test case after processing or owed.
Vacuum tempering furnace shell and the heat exchange equipment material test sample should also be placed in water system, a yearly weight loss test to check the effect of the processing. Coil of diffusion pump cooler must pay special attention to. Should be check regularly. If blocked, diffusion pump will be overheating and loss of function, but also further cause the diffusion pump heater burning, cause of expensive, time-consuming repairs. When snake-like cooling water pipe plug, water will disconnect with water and the drainage and use compressed air to blow or wash with dilute acetic acid solution.

2016年7月19日星期二

The vacuum furnace maintenance and maintenance

The vacuum furnace maintenance and maintenance


1, according to the PLC program of low vacuum: all the vacuum valve closed, start the mechanical pump, after waiting for its running normally (about 1 to 2 min), open to the furnace of low vacuum valve disc valve, in advance of furnace smoke low vacuum;
2, according to the PLC program, high vacuum, open the valve disc, the diffusion pump suction, after 15 Pa under vacuum, the system automatically open to preheat diffusion pump, diffusion pump in about after 45 min started its function, can closed on disc valve, at the same time open the main stop valve for vacuum degree of 1.33 x 10 Pa, the samples can only open the heating button to heat.
Vacuum furnace maintenance guide equipment operators within the scope of responsibility of equipment point check parts, with the right inspection methods and tools based on the tally equipment daily maintenance cycle; The operator according to the daily maintenance manual fill in the heat treatment equipment daily maintenance records, and check by the team leader review, maintenance man to collect the archive. According to the technical requirements after the installation of complete equipment, perfect and has a good grounding, debugging and acceptance in accordance with the following items.